Voltage Transformer Testing Before Relays Use the Circuit
Voltage transformer testing on an isolated instrument VT, called a potential transformer in US field language, checks nameplate ratio and polarity, winding insulation resistance, secondary burden, and a single secondary ground. Oil, dissolved gas, and a power transformer's turns-ratio rules stay with that other machine. The VT comes off the bus before a lineup insulation test, a very low test voltage can fake a ratio fault, and a capacitive unit changes the polarity and capacitance work.

What Voltage Transformer Testing Proves
Voltage transformer testing proves an instrument VT still supplies the scaled secondary that meters and relays expect. A control potential transformer is a higher-VA unit and is not the metering or primary-protection device under test.
An instrument voltage transformer reduces system voltage to a secondary used by meters, relays, and control circuits. That potential transformer is the device that scales system voltage down for the panel, and it is the instrument on this sheet.
A commissioning engineer often arrives with a megger and a search result written for a power transformer, or for a small coil checked with an ohmmeter. Those results answer a different job. The question here is whether this VT still matches its nameplate before a relay is allowed to use the circuit.
A low reading can miss the error that shows up only when the core is excited closer to rated voltage. Ratio and accuracy class are different claims.
A Physics Forums thread on industrial potential-transformer connections records one contributor's line that the unit only steps the primary voltage by its ratio, and that metering and fault detection differ by accuracy.
Tests That Belong on the Instrument VT
The electrical tests for this VT are insulation resistance, polarity, turns ratio on the taps, burden at the terminals, a single grounding point, and optional withstand or power-factor checks whose voltages stay in the specification. Oil, dissolved-gas analysis, impedance, and the 0.5% power-transformer turns-ratio band stay on the other machine.
ANSI/NETA ATS-2013 lists the electrical tests for a voltage transformer. An inductive voltage transformer, the iron-core unit with primary and secondary windings, is the machine those items describe.
- Bolted-connection resistance, where it applies.
- A one-minute insulation-resistance check, winding to winding and each winding to ground.
- Polarity, so the marks or the H1-X1 relationship agree.
- Turns ratio on all tap positions.
- Burden measured at the transformer terminals.
- An optional one-minute primary dielectric withstand, with the secondaries grounded.
- Power factor or dissipation factor.
- One grounding point, per ANSI/IEEE C57.13.3.
Acceptance, as that specification states it. Polarity agrees with the marks. Ratio errors follow IEEE C57.13.
Measured burdens are compared with the instrument-transformer rating. A dielectric application passes when there is no distress by the end of the application. Circuits are grounded at only one point.
| On this instrument VT | Leave on the power transformer |
|---|---|
| Insulation resistance, polarity, turns ratio, burden, one ground | Oil sample and oil-quality tests |
| Optional withstand and power factor, voltages stay in the specification | Dissolved-gas analysis |
| Ratio errors read against IEEE C57.13 | Impedance |
| Burdens compared with the VT rating | The turns-ratio band used on distribution and power transformers |
IEEE C57.12 is the other machine's turns-ratio rule for that band.
An engineering forum also recorded a dispute in which a power-transformer voltmeter note was rejected for voltage transformers.
Coupling-capacitor voltage transformers are a separate list in the same specification. They add a capacitance measurement and polarity marks from ANSI/IEEE C93.1. That difference is picked up after the inductive method is clear.
Isolate the VT Before a Bus Insulation Test
Test the VT de-energized and isolated. If it sits in a metalclad switchboard, disconnect it as far as practical before the insulation-resistance test and write down what remained connected. Record that disconnect on the VT report, and stop before the note turns into a lineup acceptance procedure.
A bus insulation test is next, and the VT is still racked in. Ergon's voltage-transformer work practice says to test the VT de-energized, isolated, and earthed under that utility's rules, and to disconnect it as far as practical when it lives in metalclad switchgear.
The report should say what stayed connected. Keep that note on the VT, and leave lineup acceptance on its own sheet.
An unfused run between the secondary terminals and the fuses can see high fault current. An unearthed secondary winding is on the same hazard list. Fuse size is checked against the design.
The circuit check that belongs with isolation is the single-point secondary ground. USBR checks that single-point secondary ground at commissioning, after wiring changes, and at least every 6 years.

Check Ratio and Polarity Without Back-Feeding
Energize the primary, never the secondary, and compare the measured turns ratio with the nameplate.
Turns ratio compares measured primary-to-secondary voltage with the nameplate figure. It is the check that asks whether the secondary voltage is the voltage the nameplate promised. Polarity is the marked-terminal relationship, often H1-X1, so the secondary swings the direction the relay expects.
From the field: On an engineering forum, a tester reported ratio error up to about 10% when the primary was held near 1% of rated voltage, and a negligible error after the primary was raised to about 20% of rated voltage — field report.
That report is a field argument about excitation. Read it as the tester's story, rather than as a pass-fail limit or a nameplate stamp.
The same thread reported 0.2% error at 2000 V on an 11000/110 V unit, and a large error at 100 V. A contributor there said 120 V applied to a 69 kV unit often reads about 1% to 3% off a 0.3% class unit, and that reading was being treated as a failure.
USBR FIST 3-8 puts the about-3% line on relaying potential transformers as something to investigate, not as an accuracy class and not as a factory limit for any catalog unit. The uncertainty of that ratio method should stay under 1.2% for ratio and 1 degree for phase angle.
Ergon treats an applied voltage greater than 5% of rated primary voltage as the line for an accurate ratio assessment. A 100 V or 240 V ratiometer output can fall short of that line on a high-voltage VT. Below the voltage that utility specifies, the result verifies ratio only and does not demonstrate a composite-error class.
- Put the source on the primary. Never energize the secondary and measure the primary.
- Leave no secondary burden except the instrument.
- Compare the measured ratio with the nameplate, on the taps that are in use.
- Read polarity from the marks. A lantern-battery flick belongs to the inductive unit, not to the capacitive case below.
Valence's training note says secondary taps are often 115/67 V, 120/69 V, or 120/208 V. Those are common tap arrangements in that note.
A 6 kV or 10 kV indoor catalog row is a separate nameplate from those tap examples.

What Winding Insulation Resistance Can See
A one-minute winding-to-winding and winding-to-ground test checks insulation resistance. It does not test inter-turn insulation.
Insulation resistance is that DC check, the megger's question of whether the insulation still looks like a high resistance. USBR's relaying practice uses 500 V for one minute on the secondary circuit, with relays and unknown burdens removed and the primary circuit grounded, and it calls for investigation below 1 megaohm.
Typical values in that same note should be much greater than 1 megaohm.
DC insulation resistance does not test inter-turn insulation. A passing megger can sit next to shorted turns and still look quiet.
Shorted turns need a different look. A quiet megger still leaves the ratio check to be run.
Optional withstand and power-factor checks remain on the NETA list. Their test voltages are table-driven or taken from the manufacturer, and those table voltages stay in the specification.
Insulation test voltage in that training note should never exceed 1.6 times the potential-transformer rating unless the maker authorizes a higher value. That sentence is a ceiling in the training note, rather than a voltage to apply.
When Burden Decides the Accuracy Class
A no-burden voltage comparison does not establish an accuracy class. Burden is the secondary load the class assumes, and USBR describes a typical potential-transformer secondary as 69 V or 120 V. Excitation belongs only as a comparison with the manufacturer curve when the test set provides it.
Accuracy class is the nameplate limit on ratio error inside a stated voltage and burden. The allowed miss holds only while the load and the voltage stay inside that class.
Adding devices in parallel increases burden. If the burden exceeds the rating, the potential transformer cannot measure voltage accurately, even when a no-load voltage comparison still looks fine.
A second relay paralleled onto a secondary that already sits near its class burden is the usual argument. The ratio can still look fine.
The circuit can still sit outside the class. That is what the burden check is there to catch.
The letters below are standard burden designations at a 120 V secondary in a relay-training table, not catalog ratings for any Andeli unit.
| Burden letter | VA at 120 V secondary | Power factor |
|---|---|---|
| W | 12.5 | 0.7 |
| X | 25 | 0.7 |
| Y | 75 | 0.85 |
| Z | 200 | 0.85 |
| ZZ | 400 | 0.85 |
| Accuracy class | Ratio-correction band | Load power factor |
|---|---|---|
| 0.3 | 1.003 to 0.997 | 0.6 to 1.0 |
| 0.6 | 1.006 to 0.994 | 0.6 to 1.0 |
| 1.2 | 1.012 to 0.988 | 0.6 to 1.0 |
Those labels stay in that training table, rather than new names for an Andeli accuracy class.
Ergon still prefers a high-precision ratiometer for an inductive voltage transformer, and says a Votano-type set may be unsuitable for high-excitation designs. That set can report ratio, winding resistance, excitation, and short-circuit impedance.
Acceptance of the excitation curve stays with the manufacturer curve when the set provides one.

How Capacitive Voltage Transformer Testing Differs
Capacitive voltage transformer testing adds a capacitance measurement and uses polarity marks from the capacitive standard, not the lantern-battery flick used on an inductive voltage transformer. Capacitive units are often applied at 115 kV and higher.
A capacitive voltage transformer is a capacitor divider plus an intermediate transformer. Capacitor voltage transformer testing is the same job under the other common name. Both names mean the test list grows by a capacitance measurement, and the polarity marks come from ANSI/IEEE C93.1 rather than from the inductive flick.
Coupling-capacitor voltage transformers sit on their own list in ANSI/NETA ATS-2013. The added items are capacitance of the capacitor sections and those capacitive polarity marks. Ergon leaves ratio and phase-displacement limits to the IEC and AS standards.
OMICRON has described a low-voltage capacitance check on the divider sections that finishes in less than a minute and does not depend on the capacitive design.
Match the Nameplate to the JDZ9 Product Row
Andeli's voltage-transformer hub is indoor epoxy-cast and outdoor oil-immersed instrument VTs rather than power transformers. The indoor voltage transformer for this nameplate check is the JDZ9-6/10, and only the JDZ9-6 and JDZ9-10 rows are quoted for ratio, class output, thermal output, and the printed insulation triple.
The voltage transformer hub is where those families are listed. The two complete rows below list the JDZ9-6/10 indoor voltage transformer.
Both rows are printed at a power factor of 0.8. The JDZ9-6/10 specification prints the insulation-level cells as they stand.
| Model | Ratio | 0.2 class VA | 0.5 class VA | 1 class VA | 3 class VA | 3P/6P class VA | Thermal limiting VA | Printed insulation level |
|---|---|---|---|---|---|---|---|---|
| JDZ9-6 | 6000/100 | 20 | 50 | 100 | 150 | 200 | 400 | 7.2/32/60 |
| JDZ9-10 | 10000/100 | 30 | 80 | 200 | 240 | 240 | 600 | 12/42/75 |
The JDZ9-6 row prints 6000/100, 20, 50, 100, 150, and 200 VA, thermal limiting output 400 VA, and 7.2/32/60. The JDZ9-10 row prints 10000/100, 30, 80, 200, 240, and 240 VA, thermal limiting output 600 VA, and 12/42/75.
The hub's indoor cast families are described for 6 kV and 10 kV service, and one indoor family is the 35 kV step. JDZ9-6/10 is the single-phase epoxy-cast dry type for indoor metering and instrumentation. Residual-winding models of the JDZ9-6/10 use an open-delta residual winding for earth-fault detection in ungrounded or isolated-neutral systems.
- JDZ-6/10 and JDZJ-6/10 are single-phase epoxy-cast indoor units. JDZ is the metering unit. JDZJ is the earth-fault unit, using an open-delta residual winding in ungrounded systems, and the dry type is described as maintenance-free.
- JDZ10-10 is a single-phase two-winding oil-immersed unit for outdoor lines.
- JDZX9-6/10 is a three-phase anti-ferroresonance epoxy-cast indoor unit.
- JDZX9-35 is a three-phase epoxy-insulated indoor unit with ferroresonance damping.
- JDZX10-10 is a single-phase oil-immersed anti-ferroresonance three-winding outdoor unit.
Ferroresonance on the JDZX9-6/10, JDZX9-35, and JDZX10-10 is the wording those models use for the damping or anti-ferroresonance construction. The word describes construction, separate from the test list.
This JDZ9-6/10 recommendation stops short of an outdoor line VT, a capacitive voltage transformer, a control potential transformer, or a power transformer.

The natural next step is to open the JDZ9-6/10 indoor voltage transformer and set the nameplate ratio and accuracy class next to the two rows above.
FAQ
What does voltage transformer testing check?
It checks nameplate ratio and polarity, winding insulation resistance, secondary burden, and a single secondary ground on an isolated instrument VT. ANSI/IEEE C57.13 is the instrument-transformer standard named for ratio errors, and ANSI/IEEE C57.13.3 is the single-ground practice named with that acceptance list.
How is a potential transformer test different from a power transformer test?
A potential transformer test stays on ratio, polarity, insulation resistance, burden, and the single ground. Oil, dissolved-gas analysis, impedance, and the power-transformer turns-ratio band stay on the power transformer, under IEEE C57.12 talk that does not transfer.
Why can a low test voltage make a good VT look out of ratio?
The core is barely excited, so the voltage comparison can look off while the winding is still sound. Raising the test voltage, still as a field observation rather than a new limit, is what brought the error down in the forum report.
Does a winding insulation-resistance test find shorted turns?
No. The megger sees winding-to-winding and winding-to-ground resistance. Shorted turns are an inter-turn problem, and DC insulation resistance does not test inter-turn insulation.
What is the point of a burden check?
A no-burden voltage comparison can look fine after another meter or relay is paralleled on the secondary. Burden is what tells you the circuit is still inside the accuracy class the nameplate assumed.
How does capacitive voltage transformer testing differ?
Capacitor voltage transformer testing and capacitive voltage transformer testing add a capacitance measurement and take polarity from the capacitive marks. The lantern-battery flick stays on the inductive voltage transformer.
Should the VT stay connected during a switchgear bus insulation test?
No. Disconnect it as far as practical before the insulation-resistance test, and write down what remained connected. That note stays on the VT report.
Which Andeli voltage transformers are on the hub?
The hub names JDZ-6/10, JDZJ-6/10, JDZ10-10, JDZX9-6/10, JDZX9-35, JDZX10-10, and JDZ9-6/10. Only the JDZ9-6 and JDZ9-10 rows are quoted here with ratio and VA figures.
References
- US Bureau of Reclamation, FIST 3-8, Operation, Maintenance, and Field Test Procedures for Protective Relays and Associated Circuits.
- Ergon Energy, Voltage Transformer Testing, work practice 2934600.
- Valence Electrical Training Services, PT Testing: Back to the Basics: PT testing training note
- Physics Forums, How are potential transformers used and connected in industrial applications: forum thread